PROJECT RESPONSIBILITIES

Design-build or a general contractor: who does what?

Understand design-build and general contractor arrangements before a whole-home remodel. Map drawings, selections, approvals and construction responsibilities.

4 min read · New Horizons Remodeling LLC · Planning notebook · Published

01

Compare the arrangement, not just the label

Design-build generally describes an arrangement that brings design and construction responsibility together. A general contractor may instead build from drawings and specifications prepared through a separate design agreement. Actual services vary: some contractors offer selection assistance, some coordinate outside professionals and some require a developed construction package. Ask for the proposed responsibilities in writing. The label alone does not tell you who produces drawings, checks technical feasibility or owns the next decision.

02

Begin with what you already have

If you have approved drawings and a detailed selection schedule, the immediate need may be a construction proposal based on that information. If you only know that the kitchen feels closed off, layout development and feasibility still need attention. Between those points are partially developed plans, inspiration boards and informal sketches. Identify the stage accurately so a contractor can explain what is sufficient to price and what requires further work. A photograph of a room you like is a reference, not a construction specification.

03

Trace one change through the whole team

Consider an illustrative project: enlarging a kitchen opening also changes cabinet placement, lighting and the floor transition. Ask who develops the layout, who determines whether professional structural input is needed and who updates the construction documents. Then ask who checks that the revised cabinet order matches those decisions. An integrated team may coordinate these steps internally; separate design and construction teams need an agreed handoff. Either arrangement needs a clear record so each person works from the same version.

04

Separate design decisions from product purchases

Choosing the look of a bathroom is different from checking fixture clearances, documenting the layout and coordinating the installation. Identify who selects each item, who confirms compatibility and who orders it. Clarify what happens when an item becomes unavailable. If you supply products yourself, ask about delivery dates, storage, missing parts and the point at which the team needs final specifications. These questions apply regardless of whether one company or several professionals are involved.

05

Agree on review points

A useful sequence has moments when you can see what is being decided: initial scope, layout, technical requirements, selections, proposal and construction readiness. Ask what deliverable you receive at each point and what your approval means. If design and construction are separate agreements, clarify how information passes between them and when the construction estimate is updated. Do not assume that paying for one stage automatically includes another. Scope, fees and document-use arrangements should be understood in the agreements you are considering.

06

Choose around your decision-making needs

Some homeowners want a single coordinating contact; others already have a designer they intend to retain. Some want extensive alternatives before selecting a direction, while others have a tightly defined replacement scope. Explain those preferences early and ask how the proposed team would work with them. A good fit depends on the actual people, project and communication process. Neither delivery label guarantees a lower price, a shorter schedule or a better result on its own.

07

Clarify the New Horizons scope at the first conversation

When contacting New Horizons, say whether you have plans, need help defining the renovation or are working with another professional. List any expected drawings, engineering or design deliverables so their availability and responsibility can be discussed explicitly. This guide explains common arrangements; it does not advertise an in-house architecture or engineering service. Before proceeding, confirm the services included in your particular proposal and any work that needs a separately qualified provider.

TAKE THIS TO YOUR CONSULTATION

Your next steps

  • Identify whether you have ideas, preliminary plans or a construction package.
  • Name the person responsible for every drawing and selection.
  • Agree on version control and review points.
  • Clarify purchasing and substitution responsibilities.
  • Confirm the actual services in the proposal.

Planning guidance from New Horizons Remodeling LLC. Your property, agreed scope and applicable requirements determine the actual project.